Silt removal works in ALGAS anchorage

From 10 to 24 April, silt removal works are being conducted in the ALGAS anchorage in Singapore. According to the Maritime and Port Authority of Singapore Port Marine Notice No.57 of 2017, the work is being carried out between 0700 and

1900 hours daily – including Sundays and Public Holidays – within the working area bounded by the following coordinates (WGS 84 Datum):

1) 01 deg. 14.370’N / 103 deg. 39.216’E

2) 01 deg. 14.120’N / 103 deg. 39.332’E

3) 01 deg. 13.999’N / 103 deg. 39.074’E

4) 01 deg. 14.249’N / 103 deg. 38.957’E

Silt removal on a wreck will be carried out by a dredger. A safety boat will be deployed in the vicinity to warn other craft about the work.